Bill created specs for the following potential road projects for 2026:
Project 1 — 10th Ave: Chip and Seal
10th Ave: chip and seal from the R.R. tracks to the Duck Creek culvert.
Project 2 — 11th Ave: Chip and Seal
11th Ave: chip and seal Dover Dr. to Duck Creek Ave.
Project 3 — 9th Ave: Chip and Seal
9th Ave: chip and seal from Deerborn to County Road “J”.
Project 4 — 10th and 11th Ave: Crack Fill/Road Work
10th Ave: check fill from Dyke to County Road “E”.
11th Ave: crack fill from Duck Creek Dr. to Country Road “E”.
Project 5 — Deerborn: Wedging
Wedge from 10th Ave for 1/4 mile, 1/2 mile, 3/4 mile, and 1 mile.
Project 6 — West 7th Dr. Sink Hole Repair
West 7th Dr. Debris removal and refill with gravel/sand.